Warning: strtotime() [function.strtotime]: It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected 'UTC' for 'UTC/0.0/no DST' instead in /home/tuvegypt/public_html/libraries/joomla/utilities/date.php on line 56

Warning: date() [function.date]: It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected 'UTC' for 'UTC/0.0/no DST' instead in /home/tuvegypt/public_html/libraries/joomla/utilities/date.php on line 198

PDF Print E-mail
Written by Administrator   
Tuesday, 08 March 2011 13:19

 

Quick History of ISO 22000

June 2001: Proposal of the „Danish standardisation body (DS)“
to ISO/TC 34 („Food Products“)
Harmonization 
 
 
Nov. 2001: Project Start -  ISO/AWI 22000
„Food safety management systems – Requirements“
- Basis ISO Guide 72:2001 („Management Systems“)
- Accordance with  FAO/WHO and national Standards
- HACCP
 
Sept.2005:First Version
 
ISO 22000 is applicable for
- organizations involved in the food chain
- organizations that have an influence on the Food Safety
  (regardless of size and complexity)
e.g.
- primary production
- procession
- slaughter houses
- production of additives
- transport
- point of sale
- service provider (cleaning, pest control)
- producer of production aids
(cleaning agents, engines, packaging material....)
 
what has to be controlled ?
 
- operative PRP
- Limits for CCP
- measuring equipment
 
what has to be validated?
 
- combination PRP and HACCP Plan
-
- operative PRP
-
- HACCP-Study, limits for CCP, detection method
-
- all defined measures to reduce or eliminate
  risk to an expectable level
 
what has to be verified?
 
- control procedures
- communication flow
- hazard Analysis
- operative PRP
- Infrastructure und Maintenance
- Personal management, training
 
 
Last Updated on Friday, 17 June 2011 21:07
 
All rights reserved [privacy statement]
© TÜV Egypt | Website2011| Mob:+017-4070770 | Phone: (202) 3336 8049 | Fax: (202) 3336 8047